20/26

Apologies for Absence and Named Substitutes

Minutes:

Apologies for absence were submitted on behalf of Councillor R.E. Lambert with Councillor D.J.A. Forsythe in attendance as her named substitute.

 

Apologies were also received from Councillor S.A. Webb as portfolio holder for Health and Wellbeing, Leisure and Culture.

 

21/26

Declarations of Interest and Whipping Arrangements

To invite Councillors to declare any Disclosable Pecuniary Interests or Other Disclosable Interests they may have in items on the agenda, and to confirm the nature of those interests.

Minutes:

Councillor S. Robinson declared, for transparency, that the Worcestershire County Council (WCC) Cabinet Member for Environment and Communities, who was attending in connection with the Libraries Unlocked item, was her husband.

 

No other declarations of interest or whipping arrangements were declared.

 

22/26

Libraries "Unlocked" Update

A presentation will be provided on the day of the meeting for this item.

 

 

 

Minutes:

Representatives of WCC presented an update on the implementation and impact of Libraries Unlocked across Worcestershire, with particular attention given to Bromsgrove and Rubery libraries.

 

The Board was advised that Libraries Unlocked was operating at 11 locations. A further implementation at Woodrush Library was being progressed, subject to lease negotiations with the Black Pear Trust. This was expected to be the final site in the current programme. Across the service, Libraries Unlocked had more than 21,000 registered members and more than 14,000 active users. Since the programme began in 2022, more than 8,700 hours of community led activity had taken place in participating libraries.

 

Across the 11 sites, total library opening hours had increased by 59 per cent, while staffed opening hours had reduced by 31 per cent. Libraries Unlocked had not been progressed at Alvechurch because of prohibitive Private Finance Initiative (PFI) related capital and revenue costs, or at Hagley because increased building costs had reduced the projected return on investment.

 

Bromsgrove and Rubery libraries had joined the scheme in early 2024. Both were reported to have healthy levels of visits, book issues, computer use and community led activity, although neither had extensive meeting room facilities.

 

The total capital investment across the 11 sites was reported as approximately £580,000, with staffing savings of just over £300,000. Approximately £33,500 had been deducted from gross savings to account for additional utility costs. At Rubery, this amounted to approximately £4,000. At Bromsgrove Library, utility costs had not been separately apportioned because the library formed part of the Parkside building and there was no mechanism for separately monitoring the library’s consumption. Property Services would investigate whether utility expenditure at Parkside had noticeably increased following implementation in March and April 2024.

 

Customer feedback indicated that barriers to joining included insufficient information, the requirement to attend a face-to-face induction, access to toilets, safety concerns and a desire for Sunday opening. In response, information sessions had been introduced, toilets had been made available at some locations and library managers were sharing good practice on community engagement. Officers were considering a trial of online registration, while recognising the safeguarding and health and safety value of the existing face to face induction. A communications campaign highlighting the safety of Libraries Unlocked was also planned.

 

A survey undertaken to inform the refreshed library strategy had ranked Libraries Unlocked as the third library service most useful to families, after books and the provision of welcoming community space.

 

Eligibility had been extended to people aged 15 and over so that pupils in Years 10 and 11 could access libraries during examination preparation. Local library teams were working with schools and attending community events, while central social media campaigns promoted libraries as quiet study spaces offering study and wellbeing support.

 

After the presentation, Members queries and officer feedback were discussed which included:

 

  • How was an “active” user defined? - Officers explained that this was defined as a unique individual who had used Libraries Unlocked during the relevant reporting period. Entry was recorded  ...  view the full minutes text for item 22/26

23/26

Local Heritage Action List - Quarterly Update pdf icon PDF 139 KB

Minutes:

The Principal Conservation Officer updated the Board on the development of the Local Heritage List.

 

Lists had already been adopted for Alvechurch, Beoley, Belbroughton with Fairfield, and Dodford with Grafton. Draft lists had been prepared for Bromsgrove, Bournheath, Catshill and North Marlbrook, and Wythall. Work was continuing for Lickey and Blackwell and Bentley Pauncefoot and had commenced or was about to commence for Clent and Hagley.

 

The draft lists for Bromsgrove, Bournheath, Catshill and North Marlbrook, and Wythall were ready to proceed to formal consultation. Letters were expected to be issued to property owners, parish councils, ward councillors and other interested bodies. Consultation was expected to begin on 28 September 2026 and continue until the end of the first week of November 2026.

 

Consultation events would enable residents to discuss the proposals with conservation officers. Further sites could be nominated during the consultation. Following consultation, officers would review the representations, amend the lists where appropriate and prepare a consultation summary. The amended lists would then be reported to Cabinet, with adoption anticipated in the new year.

 

Following the update, Members asked why nationally listed buildings did not appear on the Local Heritage List.  The Principal Conservation Officer explained that the local and national lists were separate. National listing was determined by the Secretary of State on advice from Historic England. Whereas statutorily listed buildings could not be placed on the Local Heritage List because they already had a higher degree of protection.  Locally listed buildings would not receive statutory listed building protection but would remain non designated heritage assets and would be a material consideration in the planning process.  It was also confirmed that ordinary planning requirements would continue to apply.

 

Members asked when the work would be completed across the district.  Members were advised that the project was detailed and resource intensive and was approaching the halfway point. No firm completion date could be given because progress depended upon workloads and the requirement to respond to planning applications within statutory deadlines.

 

Members noted that the four lists currently approaching consultation had taken more than a year to prepare and expressed concern that completion across the district could take too long.  In response it was explained that staff changes and a period without a second conservation officer had affected continuity, however, members were advised that a consultant continued to provide support.

 

Members suggested that an alternative plan was needed, including an assessment of the hours and resources required to complete the project. Members emphasised that the local list should be progressed promptly because of the scale of anticipated development.

 

The Portfolio Holder agreed that the total work should be estimated and divided into manageable phases so that the case for additional resources could be considered, while acknowledging that the number of potential heritage assets in each area could not be known until detailed work began.

 

RESOLVED that the Local Heritage Action List – Quarterly Update be noted.

 

 

24/26

Food Waste Implementation pdf icon PDF 411 KB

This report is for information only.  A presentation will be provided on the day of the meeting for this item.

 

Minutes:

The Environmental Services Manager presented an extensive update on the introduction of household food waste collections.

 

The Environment Act 2021 and the simpler recycling reforms required councils to standardise recycling arrangements, reduce landfill and lower waste related carbon emissions. Separate household food waste collections had become a statutory responsibility from 31 March 2026. Approximately one quarter of English authorities had not implemented a service by that date.

 

Although Government had provided capital funding for vehicles and food caddies, anticipated ongoing revenue funding had not materialised as a distinct additional allocation. The funding had instead been incorporated into the general settlement without an increase equivalent to the operating cost of the service. This had significantly affected planning.

 

Neither the Bromsgrove nor Redditch depot had sufficient capacity for the additional vehicles and staff. An initial joint outsourcing procurement with Redditch Borough Council and Wyre Forest District Council had not proceeded after Wyre Forest withdrew following the Government’s revenue funding decision. The scale of this change meant the original contract could not be awarded under procurement rules.

 

The service was therefore being developed in-house using leased operational land. Vehicles had been ordered, recruitment had commenced, caddies were expected during October 2026 and vehicles were expected in December 2026. A phased collection rollout was planned from late January or early February 2027.

 

It was explained that each household would receive a small kitchen caddy, liners and a lockable 27 litre kerbside caddy. Waste composition analysis undertaken in 2022 suggested that food represented approximately 35 per cent by weight of the average residual waste bin in Bromsgrove.

 

Collected material would be taken to an anaerobic digestion facility near Kinver and Stourton. The process would produce biogas for energy and digestate for use as a low grade agricultural fertiliser.  Because no suitable bulking point was available within Worcestershire, collection vehicles would need to travel to the facility to unload.

 

Existing funding was sufficient to provide the service to approximately 55 to 60 per cent of Bromsgrove households. Subject to an additional budget allocation of approximately £190,000, remaining households would be added through a second phased rollout. Full statutory compliance was anticipated by October 2027.

 

Member queries and Officer responses were advised as:

 

  • Members asked how collection rounds would be stress-tested. – The Environmental Services Manager explained that route optimisation software would model collection and journey times using existing data.
  • To explain how routine collections would be carried out. – In response it was explained that food waste collection days would mirror residents’ existing collection days where possible.  The phased rollout would allow issues to be addressed before each subsequent round began.
  • To advise on training methods for new recruits. - New employees would receive route and local area training, spend time on existing collection services and help deliver the caddies so that they became familiar with the collection areas.
  • Members stressed that effective behaviour change was essential. – It was explained that each caddy would be accompanied by an information pack explaining how to use the  ...  view the full minutes text for item 24/26

25/26

Council Tax Payments pdf icon PDF 150 KB

Additional documents:

Minutes:

The Revenue Services Manager presented the findings of an investigation into direct debits due on 15th August 2026 being collected on 14th August rather than 17th August.

 

The Council offered payment dates on the 1st, 15th, 21st and 28th of each month. When the due date fell on a non-processing day, staff had to amend the processing date manually. The officer processing the file had applied the rule used for outgoing payments, which were brought forward, rather than the rule for collections, which should be moved to the next processing day.

 

Contributing factors included insufficiently clear procedural guidance, failure of the post submission review, unused system validation controls and temporary staffing pressure caused by annual leave and long-term absence within a small team.

 

Approximately 5,500 customers were affected. Fewer than five complaints had been received and one reimbursement of less than £2 had been made. Although the actual impact was limited, officers recognised the potential seriousness.

 

Immediate action included briefing staff, reinforcing the checking process and clarifying guidance for non-processing days. Longer term work would strengthen procedure guides and investigate integration or automation between Civica and AccessPay, reducing manual intervention.

 

After the presentation Members queries and officer responses were as follows:

 

·         What was the root cause of the problem? - Officers confirmed that the incident involved human error, but that weaknesses in procedures and controls contributed. Three principal direct debit risks were identified which included collecting too early, failing to collect and transmitting a file twice.

·         What future preventative controls had been put in place? - Control totals and post submission checks were intended to prevent these errors but the post submission check had failed partly because previous reliability had created complacency. A senior officer would oversee checks during the following months.

·         Could Application Interface (AI) or automation be used? – Officers advised that AccessPay offered interfaces capable of extracting files directly from the core system. Feasibility, costs and any necessary business case would be assessed.

·         Would regular future reconciliations/audit trails be carried out? – The Director of Finance confirmed that future assurance reporting could include this issue and that a report could be brought to the Audit, Standards and Governance Committee.

·         Members welcomed the transparent “learning from errors and failure” simplistic approach and asked how widely it was used. - Officers explained that it was a Revenues Service framework rather than a corporate framework. It was designed to identify underlying causes instead of attributing every error solely to an individual.

·         Had other manual interventions across the wider service had been reviewed? – In response the Board were informed that no additional service wide review had yet been undertaken, although annual audits examined specific processes and controls.

 

RESOLVED that

 

1)            The findings of the investigation into the early collection of direct debit payments; and

2)            The actions to be taken to improve the collection process, as outlined in the investigation findings are noted.

26/26

Draft Bromsgrove Car Parks Strategy pdf icon PDF 270 KB

Additional documents:

Minutes:

Officers presented the draft Bromsgrove Car Parking Strategy for early scrutiny before Cabinet consideration.

 

Evidence suggested that the town centre had sufficient overall parking capacity, including after the future loss of the Stourbridge Road car park. Demand was, however, concentrated in central car parks. Parkside was used predominantly by season ticket holders rather than Council employees.

 

The proposed objectives included supporting regeneration and economic growth, improving customer experience, optimising use of the parking estate, supporting sustainable and low emission travel, improving management and enforcement and ensuring the network’s long term financial sustainability.

 

Potential actions included clearer signage, redistribution of season ticket holders, regular utilisation monitoring, reviews of parking in local centres, a visible enforcement improvement plan, assessment of slower electric vehicle charging and possible use of the National Parking Platform.

 

Comments and officer responses are provided below:

 

  • Members suggested signage on the approaches to the town centre identifying the most suitable car park for particular destinations. - Officers agreed to consider this to encourage the use of car parks less utilised.
  • A typographical error was outlined within the report.  - Officers confirmed that this would be reviewed and amended as necessary.
  • Questions were raised about discrepancies in capacity figures and whether the evidence distinguished between peak occupancy in individual car parks and peak occupancy across the whole network. - Officers agreed that the figures and explanation required checking and clarification.
  • Members supported moving season ticket holders towards less heavily used outer car parks and also queried whether North Bromsgrove and School Drive could be connected or expanded using adjoining land. – In response it was confirmed that this was being reviewed as a possibility, although full costs were not yet available.
  • Accessibility issues were raised, including the use of disabled spaces and payment machines. - Officers advised that all Council car parks retained cash payment facilities and agreed to examine accessibility in greater depth.
  • Members expressed concern that the surveys represented only point in time manual counts rather than comprehensive beat surveys. – The Board were advised that no registration based, half hourly surveys had been undertaken and that more detailed work would require additional resources or commissioning.
  • Members argued that forecasting needed to reflect housing growth and the Nailers Yard development, town centre residential development, free parking arrangements and other future demand before any irreversible decision was made about Churchfields. - Officers advised that Recreation Road South had been observed at below 50 per cent occupancy and that up to approximately 70 cars might be associated with the Nailers Yard commercial building, in addition to visitors.
  • Members stressed that parking pressures in local centres, including Aston Fields, Hagley, Barnt Green and Alvechurch, could be more severe than in Bromsgrove town centre. - Officers advised that strategic responsibility for parking had transferred to the Towns and Local Centres Strategic Lead, who would examine these issues.
  • An update was requested on the extra resource suggested by the Board for enforcement officers. – In response Members were advised that the Council had  ...  view the full minutes text for item 26/26

27/26

Local Government Re-Organisation (LGR) Update pdf icon PDF 290 KB

Minutes:

The Acting Assistant Director of Corporate Services and Transformation presented the Local Government Reorganisation (LGR) update to the Board.

 

Earlier in the month, Government announced a pause to the LGR process, including in Worcestershire, whilst it reviewed July 2026 decisions on future unitary authority structures. The July decision has not been withdrawn, but implementation activity has been paused pending the outcome of that review.

 

Worcestershire remained within scope of the review and LGR and devolution continue to be part of Government policy. However, there was limited clarity on the review's full scope, timetable or eventual outcome.  As a result, Worcestershire councils have moved into a preparation and readiness phase. Work linked to any specific future model had been halted.

 

There was currently no Structural Changes Order in place and no legislation to implement any new council structure. So, it remained unclear what any future proposal would involve.

 

In light of Government guidance, Bromsgrove had adopted a cautious approach to financial expenditure. Most implementation activity had been paused, including planned spend in some core areas.

 

Some limited expenditure would continue to maintain critical programme capability, including shared programme management arrangements via the Programme Director but only where it provided value irrespective of the eventual LGR outcome and represented an appropriate use of public funds.

 

Whilst most implementation activity had paused, disaggregation data and analysis activities would continue within the County Council and readiness work would continue within all councils where each council determined it was beneficial and represented value for money.

 

Decisions on any shared activity funded through the LGR Implementation Reserve fund would continue to be taken through the agreed countywide governance arrangements.

 

The current expectation was that any May 2027 local elections would proceed on existing council boundaries, however, longer-term governance arrangements would remain subject to future Government decisions and any associated legislation.

 

The approach being taken by the LGR Implementation Board was that the Board would be asked to adopt the following principle at their next meeting “Would any work still be useful under any future LGR outcome, or if LGR did not proceed?”  If yes, it should continue; if aligned to a specific LGR model, it is paused.

 

Examples of work that could continue during the pause, if approved

were as follows:

 

  • Workforce data, structures, contracts and HR records.
  • Asset information, registers, compliance and property records.
  • Contract inventories, financial analysis and readiness planning.
  • Data quality, systems mapping, governance and technology risk.
  • Service improvement, productivity, resilience and organisational effectiveness.

 

The Board was advised that further updates would be provided as the position developed.

 

The Leader asked whether the Council could access the £900,000 reportedly allocated per unitary authority to recoup transitional expenditure already incurred.  Officers were unable to provide an immediate answer and undertook to investigate further.

 

Members emphasised that continuing uncertainty created further costs and that the Council should seek to recover expenditure wherever possible. 

 

The Portfolio Holder also wished to place on record his thanks to the officer previously leading the work and wished her well  ...  view the full minutes text for item 27/26

28/26

Worcestershire Health Overview and Scrutiny Committee - Update pdf icon PDF 346 KB

Minutes:

The HOSC representative Councillor B. Kumar updated the Board following the latest meeting which was held on 21st July 2026 covering adult mental health rehabilitation and end of life care.

 

The redesign of adult mental health rehabilitation aimed to shift some care from inpatient settings to outpatient, home and community provision.

 

Members expressed concern about the reduction in inpatient bed numbers and the proposed closure of Cromwell House and Oak House. It was recognised that some people experiencing acute psychiatric episodes would continue to require inpatient care.

 

On end-of-life care, the Board noted the projected growth in Worcestershire’s older population and the need to coordinate emergency, hospital, rehabilitation, neighbourhood health, palliative and home based services.

 

RESOLVEDthat the Worcestershire Health Overview and Scrutiny Committee update be noted.</AI5>

 

 

29/26

Finance and Budget Working Group - Review Terms of Reference and Membership pdf icon PDF 304 KB

Minutes:

Members received a report reviewing the Terms of Reference for the Finance and Budget Working Group for the 2026/27 municipal year.

 

It was agreed that the Working Group would appoint its own Chair.

 

It was also agreed that the Chair of the Audit, Standards and Governance Committee should not serve on the Working Group because of the potential conflict between scrutiny and audit responsibilities.

 

RESOLVEDthat the revised Terms of Reference for the Finance and Budget Working Group be approved.

 

30/26

Police and Crime Panel Briefing Paper pdf icon PDF 250 KB

Minutes:

Councillor B. Kumar provided a summary of the latest Police and Crime Panel meeting held on 10th July 206.

 

Long term road safety performance had improved, with collisions down by nearly 40 per cent since 2016, although fatal and serious injuries remained a concern. Public consultation indicated opposition to police force mergers, particularly because of concerns about local visibility, priorities and community knowledge.

 

Crime was described as broadly stable or reducing in several categories, although domestic abuse, rape and robbery had increased.  Detection rates were stronger for robbery, violence and rape but weaker for burglary, vehicle crime and domestic abuse.  Emergency response and 101 performance remained below target, while 999 call handling was strong.

 

Members welcomed the detailed report but questioned whether collision data understated the true number of incidents because many slight or serious collisions were not reported. The Council’s representative agreed to raise concerns about the completeness of collision data with West Mercia Police.

 

RESOLVED that the Police and Crime Panel Briefing Paper was noted.

 

31/26

Cabinet Work Programme pdf icon PDF 275 KB

Minutes:

The Cabinet Work Programme was presented for Members’ consideration. 

 

No additional substantive matters were suggested.

 

RESOLVED that the content of the Cabinet Work Programme be noted.

 

32/26

Overview and Scrutiny Board Work Programme pdf icon PDF 120 KB

Minutes:

The Overview and Scrutiny Board Work Programme was considered by Members.

 

The following discussions were raised during this item:

 

  • That an agenda containing too many substantive items could weaken effective scrutiny. The Chairman and Vice Chairman agreed to review future agendas and arrange additional meetings where necessary.
  • It was noted that the timing of further consideration of the Car Parking Strategy would need to be reviewed following the decision to establish a task group.
  • Members discussed whether the Local Heritage List update needed to return at the next meeting, given the previous agreement for quarterly reporting.  However, it was advised that this was in line with quarterly reporting.
  • The heatwave and cooling hubs item had been deferred to November because relevant officers were unavailable due to training commitments. Members considered that the matter should remain on the programme.
  • Fly tipping including discarded nitrous oxide canisters should be added to the work programme for future consideration.

 

RESOLVED that the Overview and Scrutiny Work Programme be noted as per the preamble above.

 

33/26

Overview and Scrutiny Action Sheet pdf icon PDF 210 KB

Minutes:

The Overview and Scrutiny Action Sheet was considered by the Board. 

 

The Chairman requested an update on progress with live streaming of meetings, noting that bids had been expected by 26th August 2026. Officers agreed to seek a progress report from the relevant service area and report back to the Board.

 

RESOLVED that the Overview and Scrutiny Board Action sheet be noted.

 

34/26

To consider any urgent business, details of which have been notified to the Assistant Director Legal Democratic and Procurement Services prior to the commencement of the meeting and which the Chairman, by reason of special circumstances, considers to be of so urgent a nature that it cannot wait until the next meeting.

Minutes:

There was no urgent business for consideration.

 

35/26

To consider, and if considered appropriate, to pass the following resolution to exclude the public from the meeting during the consideration of item(s) of business containing exempt information:-

 

RESOLVED: that under Section 100 I of the Local Government Act 1972, as amended, the public be excluded from the meeting during the consideration of the following items of business on the grounds that they involve the likely disclosure of exempt information as defined in Part I of scheme 12A to the Act, as amended, the relevant paragraph of that part, in each case, being as set out below and that it is in the public interest to do so:-

 

Item No

Paragraph

17

3

 

 

 

 

Minutes:

RESOLVED: that under Section 100 I of the Local Government Act 1972, as amended, the public be excluded from the meeting during the consideration of the following items of business on the grounds that they involve the likely disclosure of exempt information as defined in Part I of scheme 12A to the Act, as amended, the relevant paragraph of that part, in each case, being as set out below and that it is in the public interest to do so:-

 

Item No

Paragraph

36

3

 

 

36/26

To confirm the accuracy of the minutes of the meeting of the Overview and Scrutiny Board held on 21st July 2026 (includes exempt minutes) pdf icon PDF 4 MB

Additional documents:

Minutes:

The minutes of the Overview and Scrutiny Board meeting held on 21st July 2026 were considered.

 