Minutes:
The Head of Planning and Environment Services reported the receipt of a letter of objection in respect of the wider development of plots, together with the receipt of comments from the Drainage Engineer.
RESOLVED that permission be granted subject to the conditions and notes set out or referred to on pages 56 and 57 of the report, together with the following additional condition:-
4. The disposal of water shall be by means approved by the Local Planning Authority. The approved systems shall be operational before building works commence. Soakaways and land drains are to be provided for the stable block. No direct outfall to any ditch or stream is permissible. Soakaways should also be provided for any hard surfacing / wash-down areas with an additional catch pit system.